Waste diversion reporting backed by dockets.
Diversion targets appear in most environmentally sustainable procurement policies and Green Star projects. Victoria's Recycled First policy adds contract commitments on recycled and reused material on major transport projects. EnviroTrack records waste by package with stream, quantity, disposal method and destination, so the diversion rate you report is built from each package's entries and dockets rather than contractor summaries.
How it works.
Four Streams
Construction and demolition waste, spoil, fill and soil, solid and liquid mixed waste, and office waste, each with its own items.
Where It Went
Every entry records its disposal method: reused, recycled, treated or landfill.
Hazardous or Not
Each entry can say whether the waste is hazardous, so a target can count inert waste on its own.
Against the Package
Every waste entry carries a location and belongs to the package that reported it.
Diversion Targets
Set a target as the share of waste sent to the destinations you choose, such as reused and recycled.
Waste Emissions
Waste is costed with your project’s factors and counts towards Scope 3.
Each stream reported, with where it went.
A package reports its waste each month against the items switched on for it: concrete, scrap metal, clean spoil, plasterboard and the rest. Every entry says how it was disposed of.
- Disposal method is Reused, Recycled, Treated or Landfill
- A location is required on every entry
- Liquid items such as sewage effluent are reported in litres
See where every tonne went. By route and by stream.
The Waste tab splits your tonnes by sub-category and by disposal route, and charts them month by month. Every figure comes from accepted entries.
- Waste by Disposal Route shows reused, recycled, treated and landfill
- Each stream shows its share of the total
- Compare diversion rates across your projects
Targets written the way your contract writes them.
A waste target can cap a quantity, cut it against a baseline, or measure a share. For a diversion target, choose the destinations that count and whether hazardous waste is in or out.
- Baseline to target writes the whole rule, such as Baseline minus 20%
- Destination share counts the routes you choose
- Recycled content and diversion are measured apart
Every stream a site produces.
Switch on the waste items your project reports and give each package the ones it produces. Each item belongs to one of four streams and has its own unit.
Quantity
- A Fixed Cap in Tonnes
- A Cut Against a Baseline
- Or Report Only
Destination Share
- Choose the Routes That Count
- Reused and Recycled, for Example
- Landfill Stays in the Base
Filters
- Hazardous: Any, Yes or No
- Destinations Narrow the Rows
- Inert Waste Counted on Its Own
A diversion rate built from every entry.
Diversion rates are among the most questioned figures in a sustainability report. In Catchment each one is built from the entries your packages reported, each with its stream, quantity and disposal method.
Method on Every Entry
Reused, recycled, treated or landfill, chosen before the entry saves.
Counted Once Accepted
Only accepted sections reach the waste charts and targets.
Down to the Entry
Open a stream to its items, and an item to every entry behind it.
Diversion Kept Honest
Landfill stays in the base of every destination share.
Why it matters.
Diversion rates are among the most-questioned figures in environmental reporting, because they are usually estimated from contractor summaries. Catchment records stream, weight and destination for each load, so every stream carries its own diversion rate and the destination is on record. The percentage you report sits with the dockets and named facilities behind it.
Site Teams
Enter waste by stream against the package each month.
Sustainability Leads
Report diversion by stream against target.
Clients and Rating Schemes
See a diversion figure backed by dockets.
Waste and diversion, in practice.
Which waste streams are tracked?+
Construction and demolition, spoil, fill and soil, solid and liquid mixed, and office waste. Each has its own items, such as concrete, scrap metal, clean spoil, asbestos and co-mingled recycling.
How is the disposal method recorded?+
Every entry must choose Reused, Recycled, Treated or Landfill before it saves.
Can we set a diversion target?+
Yes. Choose Destination share and the destinations that count, such as Reused and Recycled. You can also limit it to hazardous or non-hazardous waste.
Why does recycled content differ from our diversion rate?+
They are different measures. A destination share counts where the waste went. A recycled content target reads the recycled percentage entered on each item. On the same entries the two will differ, and both are correct.
Can liquid waste be reported?+
Yes. Items such as sewage effluent and concrete slurry are reported in litres, and litres are never added to tonnes.
Do waste figures count towards emissions?+
Yes, where your project has entered a factor for the item. Waste emissions count towards Scope 3.
Can we compare waste across projects?+
Yes. The organisation view adds waste across your projects, splits it by package type, and shows each project’s diversion rate against the organisation average.