Sustainable supply chain data at line level.
A sustainable supply chain is only as measurable as the data suppliers provide. EnviroTrack has suppliers record material origin and EPD coverage at line level, and records transport by package with freight and distance, so embodied carbon and transport emissions are calculated from real quantities.
How it works.
The Unit the Trade Buys In
Concrete in cubic metres, glass in square metres, pipe in metres, steel in tonnes. Each item has one unit, and any other is refused.
Tonnes Kept Apart
Totals add tonnes only, with kilograms converted. Items in other units are counted beside the total, never added into it.
Recycled Content
Each entry can record its recycled content. Left blank, it means not known and is left out, rather than counted as zero.
EPDs and Eco-Labels
Each entry answers Yes or No. A Yes names the labels the product holds and needs the EPD or certificate attached.
Your Own Items
Add your own categories and items under Materials, each with a unit chosen once, from each and metres to tonnes and litres.
Transport by Mode
Freight is reported by road, rail or sea with the distance it travelled, and costed as freight times distance.
One row per product. In the unit it was bought in.
A materials entry names the product, its mix code where it has one, the supplier and the quantity, in the item’s fixed unit. Recycled content and any EPD come with it.
- Steel is reported in tonnes, and only tonnes
- A mix code has its own field after Product Name
- Value (ex GST) is asked only where a target needs it
Tonnes add up. Cubic metres stay apart.
The Total Materials figure adds tonnes only, with kilograms converted. Concrete in cubic metres or glass in square metres is counted beside it, and the charts show one unit at a time.
- A Unit picker appears when a period holds more than one unit
- Recycled content is weighted over tonnes only
- Number of Materials counts concrete, steel, timber and other
Freight and distance, by road, rail or sea.
Transport is reported each month by package: the freight in tonnes and the distance it travelled. Catchment multiplies the two and costs the result with your project’s factor for that mode.
- Road splits into rigid truck, articulated truck and other
- Rail and sea each have their own factor
- A transport entry needs no location, just freight and distance
The materials a major project actually uses.
Switch on the categories your project reports and give each package the ones it buys. Each item comes with its unit, and your own items sit beside the library.
One Unit per Item
- Set by the Library
- Refused in Any Other Unit
- Your Own Items Choose Once
Removed Items
- Deleted if Nothing Was Reported
- Retired if It Has Entries
- Retired Items Take No New Entries
Evidence
- EPDs Asked as Yes or No
- A Yes Needs the File Attached
- Recycled Content Can Be Not Known
Embodied carbon built from real quantities.
Embodied carbon and transport emissions depend on what the head contractor rarely holds: what each package bought and how far it travelled. Catchment has each package report both, and costs them with your project’s factors.
Fixed Units
Each item is reported in one unit, so totals never mix tonnes and cubic metres.
EPDs on File
An entry that claims an EPD or eco-label has the file attached.
Unknown Stays Unknown
A blank recycled content is left out of the share, not counted as zero.
Eco-Labels by Value
A target can measure the share of materials, by value, that carry an approved label.
Why it matters.
Embodied carbon and transport emissions depend on data the head contractor rarely holds: where materials came from and how far they travelled. Catchment has the supply chain record origin and supplier at line level, records transport with freight and distance, and feeds those quantities into embodied-carbon calculations without anyone re-keying them. That turns sustainable procurement practices, such as preferencing products with an EPD, into a figure you can report against target.
Sustainability Leads
Get structured inputs for embodied carbon and Scope 3.
Suppliers
List products, eco-labels and EPDs against their own package, with the file attached.
Site Teams
Enter materials and transport against the package each month.
Procurement Teams
See how purchasing decisions move the project's environmental position.
Materials and transport, in practice.
Why can’t I enter steel in kilograms?+
Steel is reported in tonnes, and only tonnes. Divide kilograms by 1,000, or ask the head contractor for a custom item in kilograms.
Why is concrete not in Total Materials?+
Concrete is reported in cubic metres, and the total adds tonnes only. The tile says how many items are in other units, and the charts show each unit on its own.
Which eco-labels are recognised?+
Ecospecifier Green Tag, Good Environmental Choice Australia, Green Building Council of Australia BEP, ISEAL Alliance supply chain stewardship such as FSC, PEFC and Responsible Wood, and product specific or industry wide EPDs.
What if we do not know the recycled content?+
Leave it blank. A blank means not known, and the entry is left out of the recycled share rather than pulling it down as zero.
Can we add materials that are not in the list?+
Yes. The head contractor can add custom categories and items under Materials, each with a unit chosen once: each, metres, square metres, cubic metres, tonnes, kilograms or litres.
How is transport captured?+
Each month against the package, by road, rail or sea, with the freight in tonnes and the distance travelled. Emissions are freight times distance times your project’s factor for that mode.
Do we have to record what materials cost?+
Only where a target measures materials by value. Value (ex GST) is asked on an entry only when an eco-label share target covers that material.
See materials and transport on a real project.
30 minutes with our team, on live project data.