Catchment | EnviroTrack Module
Module 02 · EnviroTrack

Scope 1, 2 and 3. From site to supply chain.

Emissions, waste, water and materials captured at project level and consolidated into compliance-ready reports. No manual aggregation. No gaps at audit.

Book a Demo Explore more ↓
IG
TJ
Impact Group/Analytics
Emissions
OverviewBreakdown
All Package Types
Carbon FootprintOn Track
0tCO₂e
Scope 1, 2 & 3
Water UsageOn Track
0kL
34% recycled on site
Waste DiversionOn Track
0%
Target 75% · 16,000 t
Energy Emissions
0tCO₂e
Diesel, petrol & electricity
Waste Diverted
0t
Of 16,000 t generated
Emissions by Source
tCO₂e
Concrete & cement
15,600
Aluminium
9,850
Asphalt
5,420
Diesel
3,650
Construction/demolition
1,960
Electricity
690
Spoil/fill/soil
660
Petrol
410
Gas
160
Footprint by Scope
38,400tCO₂e
Scope 1 - 11%Scope 2 - 2%Scope 3 - 87%
Energy Emissions by Fuel
4,750tCO₂e
Diesel - 77%Electricity - 14%Petrol - 9%
Waste by Destination
16,000tonnes
Recycled - 58%Recovered - 20%Landfill - 22%
Water Balance
46,300kL
Potable - 66%Recycled - 34%

Most emissions reporting is built on estimates

Environmental data is usually reconstructed after the fact, with annualised factors and averages standing in for what actually happened on site. The number reads fine until someone asks how it was produced.

  • ✕Scope 3 sits with trade partners and suppliers, outside your system
  • ✕Fuel, waste and water move on paper dockets that die in gloveboxes
  • ✕Estimates fill the gaps where site data should be
  • ✕Reconstructing the trail at audit is expensive, sometimes impossible
Environmental entries
This period
Diesel - 14,200 LInvoice attached
Electricity - 96,400 kWhMeter reading
Concrete - 4,180 m³Docket attached
Waste - 1,240 tWeighbridge
Water - 8,900 kLAwaiting invoice
Every entry carries the document behind it

Inside EnviroTrack.

Five elements. Each one replaces an estimate with a record.

Scope 1, 2 & 3 emissions→

Emissions build from dockets and invoices as they land, with no year-end modelling.

Energy & fuel→

Metered, not modelled. Site power and fleet fuel captured at the source.

Waste & diversion→

Diversion rates come from gate records, Green Star ready without rework.

Water→

Potable, recycled and discharged volumes recorded once, at project level.

Materials & transport→

Origin and movement captured with the delivery, giving embodied carbon without the chase.

Emissions to Date
38,400 tCO₂e
Scope 14,220 tCO₂e
Scope 2690 tCO₂e
Scope 333,490 tCO₂e
In the product

Numbers a reviewer can take apart.

Every scope figure decomposes to package, source and document. When the auditor asks where 38,400 tCO₂e came from, the answer is one click, not one week.

Capture

Measured where it happens.

Fuel, energy, waste, water and materials logged at package level from dockets, invoices and meter readings, not estimated afterwards from averages.

  • Scope 1, 2 and 3 tracked in tCO₂e by work package
  • Waste streams and diversion rates from actual dockets
  • Transport movements attributed at the gate
Field capture
Mobile
Entries this Month
0
With Evidence
0%
Fuel and energyComplete
Waste dockets92% received
Logged on site, against the package it belongs to
Footprint by scope
38,400 tCO₂e
38,400
tCO₂e
Scope 1 - 11%Scope 2 - 2%Scope 3 - 87%
Consolidated from site entries, no manual aggregation
Reporting

One number, fully decomposable.

Every scope figure breaks down to package, source and document. When the auditor asks where 38,400 tCO₂e came from, the answer is one click, not one week.

  • Mapped to Green Star and the frameworks you report against
  • Compliance-ready exports on demand
  • Evidence retained against every entry
FAQs

EnviroTrack, in practice.

Do we need meters or hardware?+

No. EnviroTrack works from the documents projects already produce: dockets, invoices and meter readings, submitted from any device.

Who enters the data?+

The party closest to it. Trade partners and suppliers submit their own usage; your team reviews and accepts.

Can we run it on part of a project?+

Yes. Obligations are scoped by package, so EnviroTrack can run on just the packages that carry environmental requirements.

Our sustainability team already reports annually.+

Annual reporting reconstructs the year from whatever survived it. EnviroTrack captures at source as the work happens, so the annual number is an export, not a six-week project.

Keep exploring
SocialProGovAssureFramework mappingPricing

See EnviroTrack on a real project.

Thirty minutes with the team, on live project data.

Book a Demo