SocialPro

LIDP and Local Content Reporting

Every line item, traced to origin.

Each package reports the value and national share of every item it supplies, every month, with the ABNs of the businesses that made and sold it. Your dashboards show the ANZ share once your team accepts the month.

Book a Demo → All of SocialPro
IG
TJ
Impact Group/Analytics
Content Origin
OverviewANZ Content & ItemsMaterial Origin Map
All Package Types
Total Value Reported ($)
0
3.9% This Period
ANZ Local Value
0
86.4% of Total Value Reported
Import Value
0
13.6% of Total Value Reported
Top Reportable Items
$0$15m$30mSteelworkPrecastRebarCablingFormwork
ANZ Local Value vs Import Value
$145mTotal
ANZ Local Value - 86.4%Import Value - 13.6%
ANZ Local Value
Reported ValueANZ Local Value %
$0$10m$20m0%50%100%Nov '25Dec '25Jan '26Feb '26Mar '26Apr '26May '26Jun '26Jul '26Aug '26Sep '26Oct '26
Example Data

LIDP reporting that follows the plan you tendered.

Catchment's local content module handles LIDP reporting under the Victorian Local Jobs First Policy and local content requirements in other states. Your Local Industry Development Plan is loaded in the same structure you committed to at tender, and each package reports value and local share for every item each month, so your position against the plan updates as reports are accepted.

How it works.

Items Set Once

The head contractor lists the project’s items, each with a description, one of 21 categories and default percentages.

Switched On per Package

Each package reports only the items switched on for it, and holds a target for each category it carries.

Reported Every Month

For each item the package enters a value, a national share and a supplier count, with the ABNs of its manufacturers and suppliers.

Weighted by Value

ANZ Local Value weights each item’s share by its value, so a large item counts for more than a small one.

Checked Before Submit

A row with a value needs its share and supplier count too. Next stays disabled until every row is fixed.

Copy or Import

Start a month from last month’s items and ABNs, or import the spreadsheet template to replace it.

Content Origin Set-Up
Barangaroo Stadium
Structural SteelSteel
Precast ConcreteBuilding
Electrical CablingProduct & Materials
Site GeneratorsPlant & Equipment
Each item has a category and default percentages
Items

Set the items once. Each package reports its own.

The head contractor sets up the project’s items, each with a category and default percentages. Each package switches on the items it supplies, and its monthly Content Origin step lists them, ready to fill in.

  • A category’s target appears once one of its items is switched on
  • A package made under a subcontractor copies that subcontractor’s items
  • Manage Items switches an item on or off for the month
October Content Origin
Apex Formwork
Structural Steel$1.84m at 92% National
Reinforcing Steel$0.62m at 88% National
Formwork Ply$0.41m at 75% National
Site LightingSupplier ABN Needed
Next stays disabled until every row is fixed
Monthly Lines

Value and share by item. ABNs behind every line.

Each month the package enters a Reported Value, a National Value share and a supplier count for each item, and picks the ABNs of its manufacturers and suppliers from a search. The Total is set against the month’s claim.

  • Each row that needs attention is listed by name
  • On a Victorian project, one to three of each ABN on a row with figures
  • The Total turns green when it matches the Monthly Claim Value
Review

Locked once submitted. Changed by sending it back.

A submitted Content Origin section is locked for everyone, the head contractor included. A reviewer suggests changes in the grid and sends the section back with a comment, and only the sections not accepted return to the package.

  • Suggested values come back highlighted
  • View Rejection Notice shows the reviewer’s comment
  • Dashboards read a month once it is accepted
Review Content Origin
Summit Civil
Section SubmittedLocked
Reviewer SuggestionNational Value 85%
Section Sent BackWith a Comment
ResubmittedSuggestions Applied
Only the sections not accepted come back
National, Regional, District

Every item counted at the tier it reached.

A package’s target holds National, Regional and District percentages for each category it carries. Regional is a share of the national part and District a share of the regional part, and both appear only when the project uses them.

Barangaroo Stadium
Content Origin Targets
NationalNational Value (%)
Structural Steel
92% Procured Nationally
Electrical Cabling
78% Procured Nationally
RegionalShare of National
Precast Concrete
60% of National Value
Formwork Ply
45% of National Value
DistrictShare of Regional
Precast Concrete
25% of Regional Value
Site Labour
40% of Regional Value
CategoriesSteelBuildingProduct & MaterialsPlant & EquipmentInfrastructureLabour21 Fixed Categories
Example Data
How ANZ Local Value Is Worked Out

Weighted by Value

  • Each Item’s Share Times Its Value
  • A Large Item Counts for More
  • Never an Average of Percentages

Import Value

  • Whatever Is Not ANZ Local Value
  • The Two Add Up to the Total
  • Stated Side by Side for Each Item

Cumulative to Date

  • For a Head Contractor Reporting Totals
  • Its Latest Accepted Month Counts
  • Monthly Bars Show the Change
For Government and Major Projects

Origin a client can trace to the supplier.

Local industry commitments are checked against what each package actually supplied. Catchment keeps every item’s value and share against the package, the month and the ABNs of the businesses that made and sold it.

01

ABNs on Every Line

Manufacturer and supplier ABNs are picked from a search, never pasted, and required on a Victorian line with figures.

02

Locked Once Submitted

A submitted or accepted section is changed only after a reviewer sends it back.

03

Counted Once Accepted

Dashboards and project exports read a month’s Content Origin only once it is accepted.

04

Evidence for a Nil Month

Add Evidence saves a comment and a file against Content Origin, even with nothing to report.

Why it matters.

A Local Industry Development Plan (LIDP) is tendered line by line, developed with the Industry Capability Network (ICN), and reviewed the same way. Reconstructing origin at report time from purchase orders and supplier recollection is where local content figures become difficult to substantiate. Catchment has each package report value, local share and ABNs for every item each month, keeps the plan in the structure you tendered against, and calculates value-add using the ANZ method. Commitment, current position and variance stay in one register for the life of the project, so meeting your local content requirements under the Local Jobs First Policy is a matter of record rather than reconstruction.

Who Uses It

Head Contractors

Report the plan exactly as it was committed, by package and supplier.

Suppliers

Report value and local share against their own package each month.

Government Clients

See accepted local content against each target.

FAQs

Content Origin, in practice.

How is ANZ Local Value worked out?+

Each item’s national share is weighted by its value, so a $2m item counts for more than a $2,000 one. Import Value is whatever is not ANZ Local Value, so the two always add up to the value reported.

Can we report origin by invoice instead of by item?+

Yes. A project can report by Spend Origin instead, where a package adds one line per invoice and the origin postcode decides whether it counts as District, Regional, National or Import.

Why can’t I get past the Content Origin step?+

A row has a problem, and the step lists each one by name. Usually a value, a national share or a supplier count was entered without the other two, or a Victorian row with figures has no manufacturer or supplier ABN. A row with every number at zero is fine.

Does the Total have to equal the Monthly Claim Value?+

No. The Total turns green when it matches the claim to the cent and red when it does not, but it is a warning only. You can still continue and submit.

How do I report a month with nothing to report?+

Leave every number at zero, or add no rows, and continue. Use Add Evidence at the top of the step to leave a comment and a file for the month.

Will an item reported by a subcontractor and the head contractor count twice?+

Yes, so report each item in one package only. A head contractor that reports totals to date, with its subcontractors inside them, can ask for the cumulative-to-date setting instead.

Can I copy last month’s items or import them?+

Yes. Copy from last month brings the items and ABNs across with every number at zero, after showing what it will replace. Import replaces the month from the spreadsheet template and skips any row without a valid ABN.

Further Reading
Local content requirements and industry participation across AustraliaSocial value in renewable energy: the Capacity Investment Scheme
Keep Exploring
ParticipationCertified SpendWorkforce TargetsEvidence & CertificationSocialPro OverviewMonthly Reports

See local content tracking on a real project.

30 minutes with our team, on live project data.

Book a Demo →