EnviroTrack

Site Energy and Fuel Tracking

Every litre and kilowatt hour, on record.

Each package reports its electricity and fuels every month, each in its own unit. Every entry says whether it came from a meter reading, an invoice or an estimate.

Book a Demo → All of EnviroTrack
IG
TJ
Impact Group/Analytics
Energy, Fuels & Lubricants
OverviewCategoriesTargetsBreakdown
All Package Types
Electricity (kWh)
0
Reported This Period
Diesel (L)
0
Reported This Period
Petrol (L)
0
Reported This Period
B5 Biodiesel (L)
0
Reported This Period
Energy Emissions (tCO₂e)
0
Reported This Period
Emissions by Energy Source
01,0002,000DieselPetrolB5 BiodieselElectricity
DieselPetrolB5 BiodieselElectricity
Share of Energy Emissions by Source
4,750Total
Diesel - 44%Petrol - 24%B5 Biodiesel - 18%Electricity - 14%
Consumption Over Months
Diesel
Actual Monthly ValuesForecast Monthly ValuesCumulative Actual ValuesCumulative Forecast Values
0100,000200,0000800,0001,600,000Nov '25Dec '25Jan '26Feb '26Mar '26Apr '26May '26Jun '26Jul '26Aug '26Sep '26Oct '26
Example Data

Energy and fuel data for your project sustainability report.

Energy and fuel use is usually the largest controllable source of emissions on a construction site, and the line in a sustainability report that clients ask about first. EnviroTrack records electricity and each fuel against the work package that used it, in the fuel's own unit, so consumption is visible month by month.

How it works.

Each Fuel in Its Own Unit

Litres for diesel, petrol and LPG, cubic metres for natural gas, kilowatt hours for electricity and cylinders for acetylene. Units are never added together.

Source on Every Entry

Each entry is marked meter reading, invoice or estimate, and an estimate carries its calculation.

Renewable Electricity Named

Renewable electricity records its source: a PPA, GreenPower, or another source you name.

Switched On per Package

The head contractor switches on the fuels the project uses, and each package reports only the ones switched on for it.

Location and Use

Every entry carries a date and a location, and can say what the energy was used for, from plant and equipment to light vehicles.

Straight Into Emissions

Once accepted, each quantity is costed with the project’s factors into Scope 1, 2 and 3.

October Energy Entries
Apex Formwork
Diesel (18,400 L)Invoice
Electricity (30,000 kWh)Meter Reading
B5 Biodiesel (6,200 L)Invoice
Petrol (2,100 L)Estimate
Every entry says where its number came from
Entry

One entry per reading. As many as the month needs.

A package adds an entry for each meter reading, invoice or estimate, with its date, location and quantity. A month can hold several entries for the same fuel.

  • An estimate needs its calculation, up to 1,000 characters
  • An attached invoice with no source chosen counts as Invoice
  • A fuel added as Other must be given its name
Electricity This Period
Barangaroo Stadium
Grid Electricity360,000 kWh
Renewable Electricity60,000 kWh
Renewable electricity counts as zero Scope 2
Renewables

Renewable power, kept apart from the grid.

Renewable electricity is its own item, with a source of PPA, GreenPower or one you name. It reports its kilowatt hours and counts as zero Scope 2, so your green power is on record without adding to your footprint.

  • Grid electricity carries the project’s electricity factor
  • HVO and each biodiesel blend report their own quantities
  • Biodiesel, renewable diesel and ethanol add no upstream share
Categories

From the total down to each entry.

The Categories tab lists Electricity and Fuel Type with their quantities and emissions. Open a category to see each fuel, and a fuel to see every entry behind it, with the package that reported it.

  • The entries always add up to the fuel’s total
  • Quantities in different units are never summed
  • Download the invoice behind an entry from the list
Fuel Type
Barangaroo Stadium
Diesel310,000 L
B5 Biodiesel140,000 L
Petrol180,000 L
Acetylene64 Cylinders
Open a fuel to see every entry behind it
Category Set-Up

Every fuel your sites burn, in one list.

The head contractor switches on the electricity and fuels the project reports, and gives each package the ones it uses. Fuels, gases, oils and lubricants each have their own item.

Barangaroo Stadium
Energy, Fuels & Lubricants
ElectricitykWh
Electricity
Grid Supply
Renewable Electricity
PPA, GreenPower or Other
FuelsLitres or m³
Diesel and Biodiesel Blends
B5, B10, B20, B50 and B100
Petrol, LPG and Natural Gas
E10, LNG and CNG Too
Oils and GasesOwn Units
Lubricating and Hydraulic Oils
Grease and Solvents Too
Acetylene and Hydrogen
Quantity Only, No Emissions
Used ForPlant & EquipmentHeavy VehiclesLight VehiclesStationary GeneratorsOffered on Every Entry
Example Data
What Each Entry Needs

Data Source

  • Meter Reading, Invoice or Estimate
  • An Estimate Shows Its Calculation
  • An Attached File Counts as Invoice

Where and When

  • A Date for Every Entry
  • A Location for Every Entry
  • Several Entries a Month if Needed

Named Items

  • A Fuel Type Other Must Be Named
  • A Renewable Other Must Be Named
  • Units Fixed by the Library
For Government and Major Projects

Energy figures with their source attached.

Clients ask where an energy figure came from. In Catchment every entry says whether it was read off a meter, taken from an invoice or estimated, and an estimate shows how it was worked out.

01

Source on Record

Meter reading, invoice or estimate, chosen on every entry.

02

Estimates Explained

An estimate cannot be saved without its calculation.

03

Renewables Named

Renewable electricity carries its PPA, GreenPower or named source.

04

Counted Once Accepted

Quantities reach the charts only after your team accepts the section.

Why it matters.

Energy and fuel are hard to attribute when they arrive as a quarterly utility bill and a fuel card statement. Catchment records site electricity and fuels by package, and marks each entry as a meter reading, an invoice or an estimate. Renewable electricity and lower-carbon fuels are reported as their own items, so they can be read apart from diesel and grid power. The same data flows directly into Scope 1 and 2 emissions, so your ESG report and your emissions figures are built from one record.

Who Uses It

Site and Project Teams

See where energy goes, by package and month.

Sustainability Leads

Report consumption with the dockets and meter reads behind it.

Trade Partners

Log fuel and plant use against their own package.

FAQs

Energy and fuel, in practice.

Where does the data come from?+

Each package reports its own entries every month. Every entry is marked meter reading, invoice or estimate, and an estimate must show its calculation.

Which fuels can we report?+

Diesel and biodiesel blends, petrol and E10, LPG, natural gas, LNG, CNG, acetylene, hydrogen, HVO, lubricating and hydraulic oils, grease and solvents. A fuel that is not listed can be added as Other, with its name.

Is renewable electricity tracked separately?+

Yes. It is its own item, with a source of PPA, GreenPower or a named other. It reports its kilowatt hours and adds nothing to Scope 2.

Can we record fuel spend?+

No. Energy entries record quantities, not dollars, so fuel spend appears in no EnviroTrack figure.

Why are diesel and electricity not added together?+

They are measured in different units. Each fuel keeps its own total, and only their emissions, in tCO₂e, add up.

Does it feed emissions reporting?+

Yes. Once the section is accepted, each quantity is costed with your project’s factors: fuel into Scope 1 with an upstream share in Scope 3, and electricity into Scope 2 with its own upstream share.

Can trade partners report their own fuel?+

Yes. Each package reports the fuels switched on for it, against its own package, and the head contractor package can report every one the project uses.

Further Reading
Building the modern construction tech stackSustainable supply chains and social procurement in construction
Keep Exploring
EmissionsWaste & DiversionWaterMaterials & TransportEnviroTrack OverviewFramework Mapping

See energy and fuel tracking on a real project.

30 minutes with our team, on live project data.

Book a Demo →