At least six rules changed in 2026. What to check before you sign off a client's numbers.
Your name is on the advice. Published data from 14.36 million labour hours makes one point plainly: a percentage is only credible with hours, headcount and records beside it. And at least six of the rules your clients report against changed in 2026. Here is what to check before you sign off a target or a report.
Why nowMost of the 2026 changes took effect on 1 July. A template written before then can still carry the old rule.
- Free to download
- Sources named in every paper
- No project or client identified
From the same data as "Social procurement: what the data tells us": 50 projects and 14.36 million labour hours.
- Volumes beside percentagesWhy a percentage alone should never carry your sign-off.
- Look below the averageHow a client can beat a target overall and still miss it.
- Confirm the rule versionRules moved in 2026. Which version governs your client's contract?
- Verify who countsThe test for who counts as an Indigenous business changed on 1 July 2026.
Your Copy Is Ready
Select the button below to open the PDF, then save a copy.
Download the PDFWant to talk through what it means for your projects?
Book a Demo →
A percentage is not a result, and the rules behind it moved.
The published findings from projects reporting through Catchment make a plain point: percentages without volumes mislead. A small project can show an extreme result on very few hours. Credible reporting puts hours, headcount and records beside every percentage, and your sign-off will be read against that standard.
- Labour hours behind the portfolio's percentages, across 50 projects
- 14.36M
- Projects that missed a trade target the portfolio beats overall
- 15 of 44
- Policies in the table below that changed in 2026, most of them on 1 July
- 6
One login across your client projects, and figures you can put your name to.
Consultants advise on obligations and sign off reports built on data they did not collect. On Catchment you see the accepted figures and the evidence behind them.
Review the data, do not rebuild it
Contractors enter their own data and the package above reviews it, so your time goes on advice and assurance rather than reconciling spreadsheets.
One login across client projects
Move between client projects from one account and see where each stands against its targets, on accepted data.
The right definition, set up once
Each target carries its definition and source policy, so the version in the contract is the one every package reports against.
Reporting you can sign
Figures reviewed and accepted, with evidence kept beside them and accepted periods locked, so the report you sign off can be taken apart.
Go deeper on the sector you bid in.
Each guide sets out what that sector's clients, policies and rating tools ask for, and what every package needs ready.
Data centresBidding for data centres? Five things data centre clients need to see.Free download →
BuildingGreen Star and Victoria's Local Jobs First changed in 2026. Five things building contracts ask for.Free download →
CommercialGreen Star's credit numbers changed. Five things a commercial client will ask for.Free download →
EducationTerm dates are fixed. So are the reporting deadlines. Five things an education build asks for.Free download →
InfrastructureA Victorian Local Jobs First miss now follows you. Five things infrastructure contracts ask for.Free download →
HealthWA has raised its Aboriginal participation targets. Five things a health contract asks you for.Free download →
Rail and transportYour tender plan becomes a contract term. Five things a transport program asks for.Free download →
Renewables and energyRenewables commitments outlast the build. Five you will have to evidence.Free download →
ResidentialOne site. Three sets of commitments. Five things a housing project asks you to report.Free download →